JANAF – Underwater inspection of cathodic protection
Deepening of the southern berth at the “Brajdica 1” container terminal in the Port of Rijeka – Port Authority of Rijeka
Deepening of the southern berth at the “Brajdica 1” container terminal in the Port of Rijeka – Port Authority of Rijeka
JANAF – Underwater inspection of cathodic protection

LNG Hrvatska d.o.o.

About the project

Construction of a pier with auxiliary facilities and a connecting high-pressure gas pipeline for the LNG reception terminal on the island of Krk. This project has strategic significance for Croatia as it aids in diversifying its energy sources and strengthens its position as a transit country for energy routes in the region. It contributes to enhancing the energy security of the entire European Union by providing alternative supply routes for gas, reducing dependence on traditional routes and suppliers.

Skip to content